Sign In | Join Free | My fazendomedia.com
China Zhangjiagang HuaDong Boiler Co., Ltd. logo
Zhangjiagang HuaDong Boiler Co., Ltd.
Zhangjiagang HuaDong Boiler Co., Ltd.
Verified Supplier

9 Years

Home > Superheater Coil >

Power Plant CFB Boiler Superheater Coil Alloy Steel ASME Standard

Zhangjiagang HuaDong Boiler Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Power Plant CFB Boiler Superheater Coil Alloy Steel ASME Standard

Brand Name : HD BOILER

Model Number : Superheater Coil

Certification : ISO9001 , SGS , TUV , ASME , EN

Place of Origin : China

MOQ : 1 set

Price : Negotiable

Payment Terms : Western Union, L/C, T/T

Supply Ability : 1500 Tons/Month

Delivery Time : 50 ~ 100 Days

Packaging Details : Iron Frame Package

Condition : New

Type : Energy Saving

Specification : Customized

Surface Treatment : Painted

Material : Alloy , Stainless steel

HS Code : 3215960855

Trademark : HD BOILER

Port : Shanghai , China

Contact Now

Power Plant CFB Boiler Superheater Coil Alloy Steel ASME Standard

Superheater Coil Description

Superheater
Fossil fuel power plants often have a superheater section in the steam generating furnace.The steam passes through drying equipment inside the steam drum on to the superheater, a set of tubes in the furnace. Here the steam picks up more energy from hot flue gases outside the tubing, and its temperature is now superheated above the saturation temperature.

Reheater
Power plant furnaces may have a reheater section containing tubes heated by hot flue gases outside the tubes. Exhaust steam from the high-pressure turbine is passed through these heated tubes to collect more energy before driving the intermediate and then low-pressure turbines.

Type
Advantages
Disadvantages
Supporting method
Pendant-type
1.Firm structural support
1. Flow blockage by condensed steam 2. Needs slow restart to purge the water that accumulates in the bottom.
supported from above
Inverted-type
1.Proper drainage of the condensed steam
1. Lack the structural rigidity, especially in high speed gas flow
Supported from below
Horizontal -type
1. Proper drainage
2. Good structural rigidity
1. They do not view the flam directly so they are mainly from the convective type
Usually supported in the vertical gas ducts parallel to the main furnace.

Function
Superheater is to increase the temperature of the steam above its saturation point.
Reheater is basically a superheater that superheats steam exiting the high-pressure stage of a turbine. The reheated steam is then sent to the low-pressure stage of the turbine. By reheating steam between high-pressure and low-pressure turbine it is possible to increase the electrical efficiency of the power plant cycle beyond 40%.The reheat cycle is used in large power boilers since it is feasible economically only in larger power plants.

Details

1. Material composition: It is made up of snake-like tubes (carbon steel, alloy steel or heat-resistant steel, etc.) and collection boxes and other supporting material. Tubes generally have 32, 38, 42 or other types of specifications, according to user's needs separately.
2. Arrangement: vertical or horizontal layout.
3. Features: beautiful appearance, size, accuracy, first-class bending and welding technology, first-class detection equipment.

Process

Power Plant CFB Boiler Superheater Coil Alloy Steel ASME Standard

Testing Equipment

Power Plant CFB Boiler Superheater Coil Alloy Steel ASME Standard

Company Introduction

Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.

1. Fabrication area of 200,000 square meters

2. 80 Engineers

3. 200 Coded welders

4. 30 Licensed Inspectors(NDT Level-III instructors)

5. Class-A Licenses for Design and Manufacture Boiler

6. ISO 9001:2008 Quality System

7. ASME Certificate of Power Boilers

8. ASME 'S','U' and NB stamp authorization


Product Tags:

convection superheater

      

reheater in power plant

      
Best Power Plant CFB Boiler Superheater Coil Alloy Steel ASME Standard wholesale

Power Plant CFB Boiler Superheater Coil Alloy Steel ASME Standard Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Zhangjiagang HuaDong Boiler Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)